- CECAPI Position Paper on the sustainability of PVC Cable Management Systems (March 2023)
- CECAPI comments on the working document supporting the revision of COMMISSION REGULATION (EU) 2019/1782 of 1 October 2019 laying down Ecodesign requirements for external power supplies (March 2023)
- CECAPI Position Paper regarding the European Standardisation Strategy (April 2022)
- Joint Position Paper about EPBD recast and electrical installations (30th March 2022)
- Joint Infographic Electrical installations are the backbone of decarbonized buildings (Dec 2021)
- CECAPI PP about ecodesign requirements on electronic displays (Feb 2022)
- CAPIEL- CECAPI PP on draft CPR delegated act on fire resistance (October 2020)
- CECAPI message about CE marking on Plugs & Socket Outlets because of RoHS (19092019)
- CECAPI PP on EC study about BACS (September 2018)
- CECAPI PP on draft European Regulation Cybersecurity Act (May 2018)
- CECAPI PP on EC proposal of Regulation on Compliance & Enforcement (March 2018)
- CECAPI PP on EC One lighting Regulation (January 2018)
- CECAPI PP on Ecodesign Consultation (May 2018)
- PP CECAPI & CAPIEL on Smart Readiness Indicator (December 2017)
- Analysis of the open scope of the WEEE II Directive 2012/19/EU (September 2017)
- Cecapi Pp On Lot 5 And 3 Electronic Displays Ecodesign Regulation22092017